Slike strani
PDF
ePub
[blocks in formation]

Expenses of maintenance and operation, including $1,500 for roof and $5,000 for park drive....

50,000 00

[blocks in formation]

Expenses of maintenance and operation, including $1,000 for

painting roof

900 00

300 00

2,200 00

[blocks in formation]

Expenses of maintenance and operation, including Tower of
Victory repairs, and iron fence and gates..

TEMPLE HILL

4,000 00

[blocks in formation]

Agent of the Onondagas, Allegany and Cattaraugus reservations

150 00

[blocks in formation]

Premium on surety bond, agent of the Onondagas, Onondaga reservation

Premium on surety bond, agent of the Onondagas, Allegany and Cattaraugus reservations.

14 40

750

[blocks in formation]
[blocks in formation]

MAINTENANCE AND OPERATION

Expenses of maintenance and operation, including travel outside the state and the purchase or exchange of automobile or automobiles. From the amount hereby appropriated, $3,000 shall be available for traveling expenses of the state engineer, in lieu of all expenses; $12,000 for topographic surveys; $15,000 for hydrographic surveys

On or before June 15, 1925, the state engineer and surveyor shall file with the governor, the chairman of the senate finance committee and the chairman of the assembly ways and means committee a tentative segregation of the amount hereby appropriated. Before any moneys shall be paid out of this fund, such segregation shall have their approval and no change shall be made in this tentative segregation during the fiscal year commencing July 1, 1925, without their approval.

DEPARTMENT OF ARCHITECTURE

93,000 00

[blocks in formation]

Expert specification writer, specification writer, chief structural engineer and structural engineer, not to exceed 4 and not to exceed $3,000 each

3,750 00

11,200 00

Expert architectural designer, not to exceed 3 at not to exceed $3,600 each

Expert architectural designer, architectural designer, junior architectural draftsman, draftsman or tracers, heating, sanitary, electrical, mechanical, civil or refrigeration engineer,

10,600 00

[blocks in formation]

engineering, heating, sanitary, electrical, mechanical, civil or refrigeration draftsman, draftsman or tracer, not to exceed 10 and not to exceed $3,200 each...... Expert architectural designer, architectural designer, junior architectural draftsman, draftsman or tracers, heating, sanitary, electrical, mechanical, civil or refrigeration engineer, engineering, heating, sanitary, electrical, mechanical, civil or refrigeration draftsman, draftsman or tracer, 6, at not to exceed $2,800 each..

Expert architectural designer, architectural designer, junior
architectural draftsman, draftsman or tracer, heating, sani-
tary, electrical, mechanical, civil or refrigeration engineer,
engineering, heating, sanitary, electrical, mechanical, civil or
refrigeration draftsman, draftsman or tracer, not to exceed
9 at not to exceed $2,500 each...

Expert architectural designer, architectural designer, junior
architectural draftsman, draftsman or tracer, heating, sani-
tary, electrical, mechanical, civil or refrigeration engineers,
engineering, heating, sanitary, electrical, mechanical, civil or
refrigeration draftsman, draftsman' or tracer, not to exceed
7 at not to exceed $2,000 each.......
Superintendent of construction, engineering superintendent,
engineer or assistant engineer, not to exceed 4 at not to
exceed $3,200 each

29,400 00

14,200 00

19,000 00

10,900 00

11,150 00

Superintendent of construction, engineering superintendent, engineer or assistant engineer, not to exceed 8 at not to exceed $2,750 each

17,500 00

[blocks in formation]
[blocks in formation]

Printing and advertising, including departmental report.... Equipment, supplies and materials, including purchase or exchange of automobile not to exceed $2,500...

4,000 00

12,000 00

Traveling expenses (not more than $500 of which may be be used for traveling outside of the state).

15,000 00

Communication

[blocks in formation]

3,800 00

7,800 00

300 00

1,500 00

1,000 00 2,000 00 750 00 2,000 00 500 00

[blocks in formation]

300 00 1,000 00

500 00

200 00

670 08

[blocks in formation]
« PrejšnjaNaprej »