in error he will report in detail all discrepancies with the original survey and submit any explanation he may have to offer as to the cause. If, on the contrary, he should report his survey correct, a joint survey will be ordered to settle the differences with the surveyor who reported the error. A joint survey must be made within ten days after the date of order unless satisfactory reasons are submitted, under oath, for a postponement. field work must in every sense of the term be a joint and not a separate survey, and the observations and measurements taken with the same instrument and chain, previously tested and agreed upon.

The

163. The mineral surveyor found in error, or, if both are in error, the one who reported the same, will make out the field notes of the joint survey, which, after being duly signed and sworn to by both parties, must be transmitted to the surveyorgeneral's office.

164. Inasmuch as amended surveys are ordered only by special instructions from the General Land Office, and the conditions and circumstances peculiar to each separate case and the objects sought by the required amendment, alone govern all special matters relative to the manner of making such survey and the form and subject-matter to be embraced in the field notes thereof, but few general rules applicable to all cases can be laid down.

165. The amended survey must be made in strict conformity with, or be embraced within, the lines of the original survey. If the amended and original surveys are identical, that fact must be clearly and distinctly stated in the field notes. If not identical, a bearing and distance must be given from each established corner of the amended survey to the corresponding corner of the original survey. The lines of the original survey, as found upon the ground, must be laid down upon the preliminary plat in such manner as to contrast and show their relation to the lines of the amended survey.

166. The field notes of the amended survey must be prepared on the same size and form of blanks as are the field notes of the original survey, and the word "amended" must be used before the word "survey" wherever it occurs in the field notes.

167. Mineral surveyors are required to make full examinations of all placer claims at the time of survey and file with the field notes a descriptive report, in which will be described

(a) The quality and composition of the soil, and the kind and amount of timber and other vegetation.

(b) The locus and size of streams, and such other matters as may appear upon the surface of the claims.

(c) The character and extent of all surface and underground workings, whether placer or lode, for mining purposes, locating and describing them.

(d) The proximity of centers of trade or residence.

(e) The proximity of well-known systems of lode deposits or of individual lodes.

(f) The use or adaptability of the claim for placer mining, and whether water has been brought upon it in sufficient quantity to mine the same, or whether it can be procured for that purpose. (g) What works or expenditures have been made by the claimant or his grantors for the development of the claim, and their situation and location with respect to the same as applied for.

(h) The true situation of all mines, salt licks, salt springs, and mill sites which come to the surveyor's knowledge, or a report by him that none exist on the claim, as the facts may warrant.

(i) Said report must be made under oath and duly corroborated by one or more disinterested persons.

168. The employing of claimants, their attorneys, or parties in interest, as assistants in making surveys of mineral claims will not be allowed.

169. The field work must be accurately and properly performed and returns made in conformity with the foregoing instructions. Errors in the survey must be corrected at the surveyor's own expense, and if the time required in the examination of the returns is increased by reason of neglect or carelessness, he will be required to make an additional deposit for office work. He will be held to a strict accountability for the faithful discharge of his duties, and will be required to observe fully the requirements and regulations in force as to making mineral surveys. If found incompetent as a surveyor, careless in the discharge of

his duties, or guilty of a violation of said regulations, his appointment will be promptly revoked.

Approved March 29, 1909.

R. A. BALLINGER,

Secretary.

S. V. PROUDFIT, Acting Commissioner.

No additional regulations have been issued or changes made to March 4, 1911.

[blocks in formation]

Manual of Instructions for the Survey of the Mineral Lands of the United States

DEPARTMENT OF THE INTERIOR,

GENERAL LAND OFFICE,

Washington, D. C., September 11, 1908.

TO UNITED STATES MINERAL SURVEYORS.

SIRS: These regulations are chiefly compiled from the practice of the various surveying districts, no changes or additions being made, except where necessary to secure uniformity and to conform to present interpretations of the law.

You are expected to strictly comply with these instructions, and no survey will be accepted or approved by the surveyorgeneral until all the requirements herein have been fully met. Very respectfully,

Approved, October 6, 1908.

FRANK PIERCE,

First Assistant Secretary.

FRED DENNETT,

Commissioner.

GENERAL INFORMATION

APPOINTMENTS

1. Under section 2334, United States Revised Statutes, the United States surveyor-general "may appoint in each land district containing mineral lands as many competent surveyors as shall apply for appointment to survey mining claims."

2. Capable persons desiring such appointments should there